South Garner Greenway Extension

Print
Press Enter to show all options, press Tab go to next option

The proposed South Garner Greenway extension has two main goals: 1) to give residents better bicycle and pedestrian options to get to White Deer and Lake Benson Parks, and 2) to prepare Garner to connect to a future regional greenway linking Lake Benson and Lake Wheeler.

The feasibility study for this project includes a multi-use path shown in yellow/orange going from the Vandora Springs roundabout south to the Lakemoor area. This element of the project is the same on all the route options. From the Lakemoor area, the study considered three routes (Option A, Option B, and Option C) shown on the map below.

A draft of the feasibility study is available below the map, along with a fact sheet on greenways in general. If you have questions about the proposed South Garner Greenway extension, please contact Assistant Town Manager-Operations Matt Roylance at mroylance@garnernc.gov.

OverallMapBoard

Draft Feasibility Study
Appendix-Wake County Greenway System Plan
Appendix-Town of Garner Parks and Recreation, Open Space and Greenways Master Plan
Appendix-Garner Forward Comprehensive Plan
Appendix-Garner Forward Transportation Plan
Appendix-South Garner Greenway Route Maps from Previous Studies 

Greenways Fact Sheet